This 35 ha landfill will enable temporary treatment of household and similar wastes gathered from Casablanca during the next 3 years pending construction of a final landfill.
The project cost amounts to 54 million MAD and includes remote control surveillance cameras, a weighbridge (for trucks), an automatic unloading hall and a security lodge for guards.
Casablanca City Council
El Mejjatia-Oulted Taleb, Mediouna Province
An 11 ha deep geological repository
A leachate evaporation pond of a capacity of 38 000 m3
A rainwater harvesting pool of a capacity of 9 500 m3
A concrete wall 3m high and 2 460m long