NEW CONTROLLED LANDFILL IN MEDIOUNA

NEW CONTROLLED LANDFILL IN MEDIOUNA

This 35 ha landfill will enable temporary treatment of household and similar wastes gathered from Casablanca during the next 3 years pending construction of a final landfill.

The project cost amounts to 54 million MAD and includes remote control surveillance cameras, a weighbridge (for trucks), an automatic unloading hall and a security lodge for guards.

  • Project Holder

    Casablanca City Council

  • Location

    El Mejjatia-Oulted Taleb, Mediouna Province

Scope of the Project

  • An 11 ha deep geological repository

  • A leachate evaporation pond of a capacity of 38 000 m3

  • A rainwater harvesting pool of a capacity of 9 500 m3

  • A concrete wall 3m high and 2 460m long